Short URL:
Photo Sharing & Video Hosting by SmugMug
  Photo Hosting  Login  Help  
 
 
Julie Zagorski  > Commercial > Bio-Retention-Project
Special Thanks to Bill Aho, Pat Francis & Byron Guertzgen of the Jefferson County Stormwater Management office for working with me to document this Bio-Retention Bank Stabilization Project. I highly support Conservation Efforts and am particularly interested in the Watershed Projects in Jefferson County. You may share these images on social media or email by clicking the "Share" button. The images may also be purchased for download if you would like the files or beautiful custom prints may be ordered in any size, finish and mounting options, the professional lab does a beautiful job and will deliver direct. Just click on the "Buy" button to see the print options. Have questions? Email Me or call 314-322-0710... Thanks for visiting!
Julie
gallery pages:  1  2  3  >  
< 8 of 21 >
Stormwater Management Coordinator Bill Aho (Left) and Tom Leonard of Leonard Excavating (right) discuss the lines marked for digging; beginning the Bio-Retention Bank Stabalization Project; Dec 14th, 2012.  Jefferson County Administration Bldg. Hillsboro MO.
Trenching begins for erosion control & bank stabalization of the stormwater ditch behind the Administration Bldg. in Hillsboro,MO. Water collected from parking lots and the bldg's. flat roof (pipes on left) have eroded the banks causing destabalization. Filtration liners and rock will be applied following leveling to encourage bio-retention (natural filtration) and diminish erosion; Dec. 14th, 2012, Jefferson County Admin. Bldg. Hillsboro, MO
A non-biodegradable plastic liner used to control water flow is moved for measurement to dig beneath roof pipes located in the hillside. Dec. 14th, 2012. Jefferson County Admin. Bldg. Hillsbor, MO.
Stormwater Mgmt Div Coord.  Bill Aho (L), Engeer Byron Guertzgen (R) discuss installation of the water drain flow control "SmartDitch" while Tom Leonard (C)  heads to the backhoe. Dec. 14th, 2012, Jeff. Cnty. Admin. Bldg. Hillsboro, MO.
Tom Leonard of Leonard Excavating and Byron Guertzgen of Stormwater Mgmt Team investigate depth of water main pipes before digging. Jefferson Cnty Admin. Bldg. Hillsboro MO Dec. 14, 2012.
Stormwater Mgmt Team Byron Guertzgen monitors depth while trenching next to water main pipes behind Jefferson Cnty Admin. Bldg. Dec. 14th, 2012 during the Bio-Retention Project.
Tom Leonard Excataving Service delivers the limestone rock to provide natural polutant filtration and bank stabalization throughout the ditch. Dec. 18th, 2012. Jefferson County Admin. Bldg. Hillsboro, MO.
Share photo: links, forums, blogs |
Keywords: construction missouri ditch conservation watershed hillsboro belew's creek smartditch precisiondigging
gallery pages:  1  2  3  >  
< 8 of 21 >

Comments

| hide gallery comments |


Photo Sharing · About SmugMug · API · Browse Photos · Prints & Gifts · Terms · Privacy · Contact · Login
© 2013 SmugMug, Inc.
Show FeedsAvailable Feeds
Gallery Photos:
Atom FeedAtom | RSS FeedRSS